top of page

Upgrade of installation at Moi Girls Secondary School

Moi Girls Secondary School in Kimilili, Kenya has now received an update of their system! They have got an inverter with higher capacity and have gotten help to balance the loads at the school inbetween the phases. Practically, this means that they will be able to power more loads!


When integrating a solar system into an existing installation, it is important to optimize the whole system to work as good as possible. We can not only see to the solar installation itself. This means that we make load inventories, perform load balancing and recommend updates that will help the users to get the functions that they need. This might include changing ordinary light bulbs to LED, or installing switches to be able to turn things off when not being used. Small changes makes a difference!



91 views0 comments

Recent Posts

See All
bottom of page